HomeAboutAwardsProductionsPeopleContactwindfall films
  View productions by: or
3 x 60 for five/TLC
Originally broadcast
25 August 2005

Series Producer
Carlo Massarella

Executive Producer
David Dugan

Producer & Directors
Carlo Massarella 
Jamie Lochhead
(Long Loads)

Production Manager
Cherry Brewer

Editors
Paul Shephard
Justin Badger






Monster Moves /
Mega Moves : Season 1  

Building movers relocate Mammoth Mansions, Tall Towers and Long Loads – wholesale!

The first programme sees a race against the clock to relocate two fragile, super-heavy mansions. The 1857 Varsity Hall is an ornate three-storey, 500 tonne masonry monster, it throws up a host of engineering headaches…the walls are weak, the windows are rotting, and an entire wing of the Hall is loose. Will it survive a nail-biting journey downhill intact? Further north in Canada, a family buy a nine-bedroom Victorian mansion. Now they have to move it to their farm. But will their dream home survive a 130 mile journey by land and ocean?

Next we watch two teams of engineers battle against storms and snow to relocate two, super-tall, top heavy towers. At Heathrow, an 1000 tonne glass and steel Air Traffic Control Tower has to be moved across one of the world’s busiest runways. Meanwhile in the frozen mountains of Canada, five 140 foot grain towers have to be moved 20 miles through a vicious snowstorm.

Finally we take a look at some seriously long loads. In Omaha Nebraska , fearless mover Dave Scribnerand his son Bill attempt to make moving history, hauling two of America ’s longest locomotives through downtown city streets. It’s an action packed trek as the 100ft long diesel train - The Centennial (above left) - and the 500 tonne steam train – The Big Boy - are heaved and squeezed out of the rail yard and across town to a new hill top home.

 

 

LINKS

Monster Moves Season Two

Monster Moves Season Three

Monster Moves Feature
  © Windfall Films Limited 2008 | Site map Created by matthackettdesign